runwayinuse

Twin Engine Touch-and-Go Runway KBZN local VFR procedures

The current flow at KBZN is uncertain right now (UNKNOWN), so whether this procedure applies at this moment is unknown. Live runway page →

Not for navigation. Verify against the official sources linked below before flight.

noise abatement Airport sponsor published verified 2026-08-28 (42 d ago)

Published by the airport sponsor; voluntary unless ATC assigns it. If ATC assigns this route to you in Class B, C or D airspace, that assignment is an ATC instruction and compliance is required (14 CFR 91.123) — and “unable” remains available to the pilot in command.

When ATC permits, twins use runway 12/30 for touch-and-go traffic.

The route

  1. When Air Traffic Control permits, utilize runway 12/30 for touch-and-go traffic

When it applies

Source text, verbatim

TWIN ENGINE AIRCRAFT
When Air Traffic Control permits, utilize Runway 12/30 for touch-and-go traffic.
[The brochure's touch-and-go pattern diagram on the same sheet is titled:] VOLUNTARY TOUCH-AND-GO-GUIDELINES / RUNWAY 11/29

The text above is the published source wording and is authoritative over any summary on this page.

Sources

All KBZN procedures · KBZN runway in use